Every project is told the same way: the problem, what I did, the decisions I took, the result and the tools. Client data is anonymised for confidentiality.
1. Control and monitoring of a generating set
Problem. A self-generation installation ran without data: no record of consumption and no way of knowing whether voltage and frequency stayed within range.
What I did. A PID control loop on the generating system in LabVIEW with the Control Design and Simulation library, plus database logging of voltage, temperature, RPM, consumption and frequency through Node-RED.
Decisions. PID rather than on/off control because the variable to stabilise was continuous; Node-RED for logging because it integrates with the hardware without custom development.
Result. Stable generation control and a queryable history of the five variables.
Tools. LabVIEW (Control Design and Simulation), Node-RED, database.
2. Spare-parts management system for Spain and Portugal
Problem. Spare parts for a vending operation across two countries were managed in spreadsheets: no traceability of stock and no control of equipment firmware versions.
What I did. A management system in Visual Basic with a database: part records, stock control, firmware versions and remote support for field technicians, alongside supplier coordination.
Decisions. Desktop application with its own database for independence from the corporate network; firmware version control inside the system rather than in separate files.
Result. Centralised orders and stock, and faster support for the technician in the field.
Tools. Visual Basic, SQL.
3. Maintenance of automated assembly lines
Problem. More than fifteen assembly lines with robots, machine vision and test benches: stopping one station is paid for in production, and drifting inspection is paid for in warranty months later.
What I did. Diagnosis and repair of mechanical, electrical and control faults; preventive maintenance of industrial robots; commissioning and troubleshooting of machine-vision stations (Keyence, Cognex); work orders, notifications and spares in SAP.
Decisions. Treat vision drift as a quality failure mode rather than a stoppage, and prioritise by line impact instead of by order of alert.
Result. Line continuity, reject-rate control and a failure history reusable for the preventive plan.
Tools. SAP, Keyence, Cognex, industrial robots; NEN 3140 electrical safety and LOTO.
4. Maintenance of an automated logistics platform
Problem. Conveyors, sorters, shuttles and automated storage in a high-throughput flow: a short stoppage halts the day’s orders.
What I did. Preventive and corrective maintenance of conveyors and sorters, automated storage systems, shuttles and cranes; work on low-voltage switchgear under safe isolation, LOTO and live-dead-live verification.
Decisions. Prioritise by bottleneck —sorter and shuttles— rather than by arrival of the alert.
Result. Fewer unplanned stoppages and lock-out discipline in electrical work.
Tools. LOTO, NEN 3140, low-voltage distribution panels.
5. Asset life cycle cost with ISO 55000
Problem. Justify the purchase of an industrial boiler to management on total cost rather than purchase price.
What I did. Life cycle cost without financial discounting: initial investment, accumulated operation and maintenance, and residual value. 80,000 + 100,000 − 5,000 = USD 175,000. Analysis of the split and comparison against a cheaper, less efficient alternative.
Decisions. Deduct the residual value, state the assumptions in writing, and flag the cost of unavailability as the item the model leaves out.
Result. The purchase price turns out to be only 40 % of the asset’s total cost.
Tools. ISO 55000, spreadsheet.
6. Root cause analysis with FMEA and 5 Whys
Problem. Recurrent leak at the mechanical seal of a motor-pump.
What I did. Failure mode and effects analysis with risk priority number calculation —S8, O4, D6, RPN 192, very high risk in the company’s table— and root cause analysis with the 5 Whys, until the absence of condition monitoring in the preventive plan was identified.
Decisions. Attack the cause —missing condition-based maintenance— rather than the consequence —replacing the seal again— and prioritise the action by RPN.
Result. Documented root cause and a preventive-plan improvement proposal with monitoring and CMMS logging.
Tools. FMEA, 5 Whys, CMMS.
7. In-house data and dashboard platform
Problem. Track several projects at once without scattered spreadsheets, keeping the data at home and without third-party services.
What I did. A small Linux server (ARM) running lightweight web services and databases: data capture and consolidation, read-only dashboards, automated backups with retention, publishing over a private network and messaging alerts. It also indexes documents with text extraction and tracks academic deadlines.
Decisions. One isolated database per project; dashboards only read while scripts write; a single owner per scheduled task; daily backup with retention and recovery after reboot.
Result. Several operating dashboards with my own data, surviving a reboot and independent of any external platform.
Tools. Python, Flask, SQLite, systemd, Docker, Tailscale, Node.
8. Maintenance tender for an assembly line *— in progress*
Problem. Build the technical and commercial offer for an asset management service on an assembly line: scope, work breakdown structure, schedule, budget and risk plan.
Status. In development as my master’s final project. Real plant case, anonymised data.